ABB
ABB 5SHY3545L0021 AC10272001R0101 IGCT Module
$350.00
$550.00
Item added to your cart
Hot Sale
Deal of the day
Hurry! Ends in
The Bently Nevada 3500/22M-01-01-00 Standard Transient Data Interface (TDI) Module, comprising part numbers 288055-01 and 146031-01, is an essential component for the Bently Nevada 3500 Series machinery monitoring system. This TDI module enables high-performance data acquisition and real-time communication for industrial machinery monitoring, offering advanced transient data analysis for predictive maintenance.
Data Acquisition: The 3500/22M-01-01-00 module continuously collects both steady-state and transient dynamic (waveform) data from Bently Nevada 3500 monitoring modules. It captures critical machine performance data, ensuring early detection of issues before they lead to failures. Standard static data capture is always enabled, with the option for dynamic data collection via a Channel Enabling Disk.
Communication Interface: The module includes a 10Base-T/100Base-TX Ethernet I/O interface (via part number 146031-01), enabling seamless communication between the monitoring system and host software (such as Bently Nevada’s System 1) over a network. This ensures quick and efficient data transfer for analysis, diagnostics, and long-term storage.
System Integration: Designed to fit within a single slot (typically Slot 1) of the 3500 rack, the TDI module works in conjunction with M-series monitors like the 3500/40M and 3500/42M, integrating effortlessly into your machinery monitoring system for enhanced performance.
Rack-Level Functions: While not directly involved in the critical monitoring path, the TDI provides common functions across the entire rack, contributing to the overall efficiency and reliability of the 3500 monitoring system.
The 3500/22M-01-01-00 TDI module is ideal for industries where machinery reliability is crucial, such as power generation, oil & gas, and manufacturing. By offering real-time data collection and advanced diagnostics capabilities, it helps prevent unexpected downtime, extends equipment life, and optimizes operational performance.
288055-01: Standard Transient Data Interface Module
146031-01: Ethernet I/O Module (10Base-T/100Base-TX) for network communication
This TDI module is a vital tool for enhancing machinery monitoring capabilities, providing the data and connectivity needed to keep industrial equipment running at peak performance.
-----------------------------------------------------------------------------------------------
Sales Manager: Trixie Tin
Email: trixie@cambia.cn
QQ: 3104494683
Cambia is a leading global supplier of industrial automation spare parts. We are committed to meeting the demands of the global automation industry, providing high-quality, reliable products to support your needs.
Our philosophy is guided by the principle of “Serving Customer Zero Distance”.
Warranty Policy:
One-year warranty from the date of shipment.
Payment Method: T/T
ABB | Bently Nevada | Ovation
PM861K01 | 3500/15 | 1C31194G01
PM864AK01 | 3500/40M | 1C31223G01
PM860K01 | 3500/92 | 1C31197G01
PM856K01 | 3500/62 | 1C31122G01
DI820 | 3500/53 | 1C31125G01
AI835 | 3500/45 | 1C31129G03
DO801 | 3500/22M | 1C31234G01
Contact us:
Call: +86-135 9950 7613
Email: trixie@cambia.cn
Honeywell | Bently Nevada | Westinghouse
T921D-1008 | 126648-01 | 1C31125G01
51304487-150 | 3300/53 | 1C31125G02
51304485-150 | 330105-02-12-20-02-05 | 1C31129G03
STG740 | 330130-080-00-00 | 1C31132G01
621-2100R | 330130-045-00-05 | 1C31132G01
621-1100RC | 330104-00-12-10-02-00 | 1C31147G01
Yes! We provide global shipping for all our products, ensuring fast and reliable delivery worldwide.
Bently Nevada 84147-01
Bently Nevada 23733-03
Bently Nevada 23732-01
Bently Nevada 18622-030-01
For inquiries, please contact:
Email: trixie@cambia.cn
Let me know if you'd like further adjustments!
WHAT WE OFFER
Controlix Automation is a components company of PLC DCS TSI control system, located in China. We major in many brands as below, Allen-Bradley, Bently Nevada, ABB, Honeywell, ICS TRIPLEX, Yokogawa, Foxboro, Bailey, Triconex, GE Fanuc, etc. Looking forward to cooperate with you.
Encoder alarms on a Siemens SINAMICS S120 drive do not always indicate a failed encoder. Learn the feedback path architecture, incremental vs....
Read more
Internal resistance and impedance measurements are vital for tracking VRLA battery degradation trends, but they cannot directly prove battery runtime capacity. Learn...
Read more
Control valve noise and vibration often signal hydraulic instability rather than simple mechanical wear. Learn the physical distinctions between cavitation and flashing,...
Read more
Explore why modular data acquisition (DAQ) architectures, synchronized multi-channel measurements, and connected digital workflows are critical for modern industrial physical testing.
Read moreAll product names, trademarks, and brands are the property of their respective owners.Our company is an independent supplier of surplus and unused industrial automation parts and is not an authorized distributor, dealer, or representative of any manufacturer.